Wastewater Improvement Works at Glen Estate
- Completion Date30 September 2024
The pump station improvement works will add additional emergency storage for peak flows, extreme weather events and other emergency situations such as power loss or pump failure.
Improvement works include the installation of two 70,000 litre underground storage tanks, and associated pipework and controls which will be positioned on the edge of the existing stormwater detention basin.
The work is expected to be completed and the tanks operational by the end of September 2024.
Location
Currawong Road, Tumut 2720 View Map
-35.3215255,148.2332174
Currawong Road ,
Tumut 2720
Currawong Road ,
Tumut 2720
Wastewater Improvement Works at Glen Estate